We begin by installing a sturdy 20 gauge, metal stud framing system that is securely fastened to your floor and wood joists above. We space the frame about an inch or so away from your concrete wall so as to create an air space. This not only allows moisture to escape but also insures straight, true walls.
We then attach out specially developed channel system that holds our ceiling and wall panels in place. This system speeds up installation by integrating the ceiling grid and stud wall.
In a conventional drywall system, the studs are installed first, then the electrical for the walls, then the board, then comes that tape, mud, sanding, more mud, more sanding, then then the first coat of paint. This is a very involved process with a lot of unnecessary mess.
In our system, we have the stud framing and ceiling grid complete. Then our electrician comes in and is able to install the outlets, lighting, and switches all in one trip.
Now comes the truly amazing part. We install our one inch, high-density wall panels. Each panel has a beautiful, durable, self-healing, acoustical fabric laminated to it: it is securely fastened into our specially made channel system leaving only a very small, neat seam between the panels that almost disappears, yet allows our panels to be easily removed if needed. The ceiling tile is installed, and then the carpet to complete the job. That is all there is to it!
When the install is complete you will have a beautiful, mold resistant, noise reducing, long lasting, low maintenance, COMPLETE BASEMENT SYSTEM IN 2 WEEKS!
|